RG GROUP - RC WORKS

Abbey wood - RC Works

Client: RG GROUP
Project Value: £4.7 Million
Project Duration: 9 Months

Overview :

  • Design and install piling mat involving importation of 14,000 m3 of crushed concrete on Tensar geotextile

  • Break down 3300 pre cast concrete piles

  • Installation of 190 pile caps pile caps and associated ground beams with 1450m3 of concrete and 180 ton of rebar

  • Cart Away of 10,000 m3 of asbestos contaminated muck

  • Design and installation of 15,500m2 of mesh reinforced floor slabs saving £300,000 by re-design