Client: | Unite Student Accommodation, Trenchard St., Bristol |
Project Value: | £2.1 Million |
Project Duration: | 7 months |
Project Details: |
Demolition of existing ice rink structure whilst keeping live music venue functioning below Installation of new pad foundations involving excavation in unstable ground up to 7m deep to bedrock and infill of mass concrete to support RC cage. Pouring of 2000m3 of concrete over three levels in a tight city centre site Excavation of mass pad foundations within existing structure with restricted headroom. Installation of RC floor slabs lift pits and podium deck structure |
Extension to existing store, mezzanine floor, reconfiguration and overlay of car park