Case Studies - Highgate

Client:Private Client via Gardiner and Theobald
Project:Basement, Swimming Pool, extensive underpinning and propping to existing basement, drainage and servicing works
Project Value:£1.1 million
Project Duration:15 weeks
Contact:Lhairg Foreman – Gardiner and Theobald

Project Details:

New Basement:
Tree Protection

Contiguous Piling 80LM

Excavate 1800M3 and Cart Away

Form basement at -7.0metres

Construct swimming pool shell

Installation of foul and storm pumps

Installation of drainage by directional drilling

Installation of land drain systems

Existing Basement:
Extension and deepening of existing basement.

4m deep underpins

Extensive steelwork designed and installed to support existing walls

New entrances formed at -7.00 m and -3.00m

Back to case Studies

Client Focus:Sainsbury's

Extension to existing store, mezzanine floor, reconfiguration and overlay of car park

Read More

Marron Civil Engineering

Marron Civil Engineering Unit 39, Sheraton Business Centre Wadsworth Close Greenford UB6 7JB Tel: 020 8601 7100 Fax: 020 8998 1982