Client: | RG Group |
Project Value: | £4.7 Million |
Project Duration: | 9 months |
Project Details: |
Design and install piling mat involving importation of 14,000 m3 of crushed concrete on Tensar geotextile Break down 3300 pre cast concrete piles Installation of 190 pile caps pile caps and associated ground beams with 1450m3 of concrete and 180 ton of rebar Cart Away of 10,000 m3 of asbestos contaminated muck Design and installation of 15,500m2 of mesh reinforced floor slabs saving £300,000 by re-design |
Extension to existing store, mezzanine floor, reconfiguration and overlay of car park